| Project name | Placement of a hothouse complex |
| Industry classification | Agriculture |
| Basic information about the project |
|---|
| Project essence | As a part of a hothouse complex greenhouses from the facilitated designs on a metalframework, subsidiary constructions, the platform for sorting and temporary storage of finished goods, subsidiary constructions for storage of stock and fertilizers will be built |
| Project capacity | Cucumbers – 25 704 t; Tomatoes – 13 056 t; Pepper – 2 679,9 t; Salad – 489,6 t |
| Consumer market description | Wholesale companies, retail, canneries |
| Object construction term | 2.00 |
| Competitive advantage | Environmentally friendly production, flexible system of pricing |
| Resource availability for project realization | Is available |
| Planned volume of resource consumption (annual) |
|---|
| Planned volume of electricity consumption (annual), MWh | 320.00 |
| Planned volume of gas consumption (annual), million cubic meters | 2.75 |
| Planned volume of water consumption (annual), million cubic meters | 2.50 |
| Degree of project development | The feasibility study is developed, the land plot is created |
| Financial estimation of the project |
|---|
| Total cost of the project, mln rubles | 17221.29 |
| Own resources, million rubles | |
| Means of regional (municipal) budget, million rubles | |
| Previously involved means, million rubles | |
| Investment capacity, mln rubles | 17221.29 |
| Conditions of investor participation | Direct investments |
| Form of investments return | Monetary |
| Payback period | 4.25 |
| Basic indicators of investment project economic efficiency |
|---|
| Net present value (NPV) | 13370.79 |
| Simple payback time | 4.25 |
| Discounted payback period | 4.75 |
| Internal rate of return (IRR) | 9.86 |
| Productivity index (PI) | 1.65 |
| Income per year | 24844.29 |
| Social efficiency of investment project |
|---|
| Number of workplaces | 553 |
| Salary average level (thousand rub per year) | 270.36 |
| Budgetary efficiency of investment project |
|---|
| Mid-annual tax payments, million rubles | 5506.07 |
| which includes into consolidated budget of the krai, million rubles | 3357.76 |
| General information about the ground area |
|---|
| Address of the area | Krasnodar Krai, municipality Kushchevsky district, 1 km to the west of Kushchevskaya's village |
| Cadastre account of ground area | Registered |
| Cadastre number of area/of quarter | 23:17:01020004:1 |
| Declared area (m2) | 977463.00 |
| Limit size of the area (m2) | 977463.00 |
| Land category | Agricultural land use |
| Kind of allowed use | Agricultural activity |
| Actual use | Cultivation of crops |
| Availability of buildings, structures, constructions | No |
| Permits, town-planning documentation | The scheme of territorial planning of municipality Kuschevsky district is developed under the municipal contract No. 9 of 20.03.2007 by JSC Institute of Territorial Development of Krasnodar region. The decision No. 153 of February 25, 2011 (About app |
| Information about proprietor (right holder) |
|---|
| Proprietor | State ownership |
| Right holder | Krasnodar region |
| Kind of right | Constant (termless) using |
| Information about encumbrance and limitation |
|---|
| Kind of encumbrance, limitation | Rent to “UVN” Uzbekov V.N |
| Encumbrance area | 977463.00 |
| Electricity supply |
|---|
| Power supply center (name, right-holder) | PS "Elevator", JSC Kubanenergo |
| Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
| Power supply center (free power (MWt)) | 1.00 |
| Power supply center (distance(m)) | 950.00 |
| Nearest connection point (network tension, kV) | 380.00 |
| Nearest connection point (distance(m)) | 950.00 |
| Gas-supplying |
|---|
| Gas pipeline (name, right-holder) | gas pipeline of the High Pressure, JSC Gazprom |
| Gas pipeline (diameter(mm)) | 110.00 |
| Gas pipeline (pressure(MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
| Gas pipeline (carrying capacity(cube. m.in a year)) | |
| Gas pipeline (distance(m)) | 500.00 |
| Nearest connection point (diameter(mm)) | 110.00 |
| Nearest connection point (pressure (MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
| Nearest connection point (carrying capacity (cubic meter a year)) | |
| Nearest connection point (distance(m)) | 950.00 |
| Water-supply |
|---|
| Water supply source (name, right-holder) | Construction of an artesian well |
| Water supply source (power (cubic meters a day)) | 10000.00 |
| Water supply source (quality of water) | Service water |
| Water supply source (distance(m)) | |
| Nearest connection point (power (cubic meters a day)) | 10000.00 |
| Nearest connection point (diameter(mm)) | |
| Nearest connection point (distance(m)) | |
| Sewage system |
|---|
| Type of building (name, right-holder) | Treatment facilities of a Municipality Administration Kuschevsky district |
| Type of building (power (cubic meters a day)) | 7500.00 |
| Type of building (distance(m)) | 100.00 |
| Nearest point of connection (power (cubic meters a day)) | 7500.00 |
| Nearest point of connection (diameter(mm)) | 300.00 |
| Nearest point of connection (distance(m)) | 100.00 |
| Installation of telephones/internet |
|---|
| Central network (distance(m)) | 3000.00 |
| Mobile communication (distance(m)) | 4500.00 |
| Rated price of the ground area supplying with engineering, mln.rub | 881.80 |
| Distance to the large settlements and objects of a transport infrastructure |
|---|
| Remoteness from | Name | Distance (km) |
|---|
| center of municipal formation | Kuschevskaya | 1.00 |
| nearest settlement | Kuschevskaya | 1.00 |
| Center of federal subject | Krasnodar city | 221.00 |
| highways (regional, federal value) | Federal motorway Ì-4 "Don" | 12.00 |
| highways of local value | «Kuschevskaya-Starominskaya» | 1.50 |
| nearest railway station | Kuschevka | 2.50 |
| nearest railway | JSC RZD | 0.90 |
| airport | Yeysk airport | 112.00 |
| seaport | seaport Yeysk | 112.00 |
| Additional information about the ground area |
|---|
| Special conditions | Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win |
| Cost of rent/buy of the ground area, mln. rub | 0.78 |
| Geographical coordinates of object (dd.dddddd) |
|---|
| Latitude (N) | 46.342793 |
| Longitude (E) | 39.33350000 |
| Notes | No |
| Data on the project initiator (in case of existence information about the legal/physical person) |
|---|
| Name / Full name | No |
| Postal address | No |
| Site | No |
| Phone/fax | No |
| E-mail address | No |
| Data about the applicant (executive authority/local government executive authority) |
|---|
| Name | Administration of municipal formation Kushchevsky district |
| Postal address | 352030, Russia, Krasnodar region, village Kuschevskaya, B.E.Moskvicha Lane, 67 |
| Site | www.adm-kush.ru |
| Phone/fax | +7-86168-558-33 |
| E-mail address | economkush@mail.ru |
| Executive (Full name, work position, phone number) | +7 (86168)54101 head of department of investments and interaction with small business of Kulikov Sergey Alexandrovich |